Frequently asked questions
About The Nest Complete Build Package. Ready to buy? See The Nest.
What is included in The Nest Complete Build Package?
Construction drawings, the Complete Material + Budget Workbook, a Cost-Saving Guide, a Permit + Site-Planning Guide, a Start Here Guide, and a single-build license, all for $249.
Which drawing sheets are in the construction set?
The sheet index on the cover sheet lists: G001 Cover sheet; A1 Floor plans and door & window schedules; A2 Roof plan and reflected ceiling plan; A3 Exterior elevations; A4 Sections; and A5 Interior elevations. The sheets are 24″ × 36″.
How do I receive the files?
Checkout and delivery are handled by Gumroad. After you complete your purchase, Gumroad gives you access to download the package files.
Is the floor plan on this website the full drawing?
No. The website shows the floor plan layout without construction dimensions, plus three watermarked sample sheets. The full dimensioned construction drawings are included in the purchased package.
Are the photos of a real house?
Yes. The photographs show a completed Nest. Furniture, finishes, and appliances shown reflect that particular build and may differ from yours.
Will my local building department approve these plans?
We cannot guarantee permit approval anywhere. Building codes, zoning rules, and site requirements vary by location, and only your local building and planning departments can tell you what they require. Please check with them before you buy or build.
Can I build The Nest as an ADU or backyard cottage?
That depends on where you plan to build. Whether an accessory dwelling unit (ADU), backyard cottage, or small primary home is allowed on a property is set by local zoning and building rules, which can limit size, height, setbacks, utilities, and use. The Nest does not automatically qualify as an ADU. Confirm with your local planning department first.
Do I need an engineer or architect?
Possibly. The construction set is an architectural drawing set. Many jurisdictions require a licensed engineer, architect, or designer to review, adapt, or stamp drawings for local conditions such as wind, snow, seismic, soils, and energy-code requirements, or to provide structural, mechanical, electrical, or plumbing documents. Your building department can tell you what is needed for your site.
Can I build The Nest more than once?
The package includes a single-build license, which covers building The Nest one time.
Does the $249 price include materials or construction?
No. The $249 price is for the digital plan package only. It does not include materials, labor, permits, site work, or professional services. Those costs depend on your location, site, and choices.
Before you buy or build: check your local requirements
Building rules are set locally and vary widely. Build Small plans are not guaranteed to meet the requirements of any particular city, county, or state, and buying a plan does not guarantee a permit. Before you buy or build, you are responsible for confirming with your local authorities:
- Zoning and use. Whether a small house, accessory dwelling unit (ADU), or backyard cottage is allowed on your property, and any limits on size, height, setbacks, or occupancy.
- Building codes. Which codes and local amendments apply, including energy, fire, and accessibility requirements.
- Site conditions. Soils, slope, drainage, utilities, septic or sewer, access, and climate loads such as snow, wind, and seismic.
- Engineering and professional review. Whether a licensed engineer, architect, or designer must review, adapt, or stamp the drawings for your site.